Building Permission PDF Print E-mail
Written by Kozhikode corporation   
Friday, 21 January 2011 10:48
PreDCRDrawing the architectural plan in DWG format as per AutoDCR software requirements


PreDCR is a software application used to create an architectural plan as per AutoDCR software requirements. It works under AutoCAD environment with an additional menu & toolbar.

Using PreDCR commands user can create all the layers required by AutoDCR in one click. Once all the layers are created in the drawing user can use AutoCAD commands to draw the plan on corresponding layers. At any time user can verify if the drawn entities are correct or not as PreDCR will highlight failed entities if any.To register PreDCR, user has to send the 20-digit reference code generated on the computer to
This e-mail address is being protected from spambots. You need JavaScript enabled to view it

. The reference key provided is to be entered in the blank space after which PreDCR will be registered in the system.AutoDCR will be implemented in Kozhikode Corporation from 24th January 2011. Online applications shall be mandatory in the Old Corporation zone (Wards 19,39,41,40,44,45,48) for buildings with an area above 200 sq.m.

Pilot phase implementation wards 19,39,41,40,44,45,48 in Old Corporation Area.

 Building plans drawn in PreDCR format can be uploaded from the Corporation website with the help of a username and password which is given to all licensed architects, engineers from the Corporation. For this registration valid license certificate and ID proof is necessary. A registration in any BPAMS enabled Corporations in the state will suffice. The drawing shall be verified on a priority basis manner after which hard copy documents have to be submitted at the Corporation for further verification. Any discrepancy found later can lead to resubmission of the drawing.

After the documents and drawings are verified by the concerned persons, the application fee is to be paid. These are then handed over to respective Building Inspector for site inspection. The site report data will be then entered by DCR cell after which the file is then transferred to the next higher authority. The building permit certificate is given after this level of verification.DCR Cell Timing

 

Documents Submission

10.30 am to 1.00 pm

on all working days

Doubts and Status of File

2.00 pm to 4.00 pm

on all working days

Login ID & Password

10.30 am to 4.00 pm

on all working days

PreDCR Training

11.00 am to 4.00 pm

on all working days

The free-training for architects will be conducted on the 3rd floor, Corporation office. Two sessions of training will be held on all working days For Registration and all other queries, please contact:-

Mr.K.Haridasan, MIS/IT Officer
Tel: 0495-2366776 or Mob: 9946487959
     

Architect Login       

Download  PreDCR for AutoCAD 64 bit

Download PreDCR for AutoCAD 32 bit

Download ZWCAD compatible PreDCR 

User Manual AutoCad

User Manual ZWCAD

Proceedings of the Secretary, Kozhikode Corporation

 Seniority list of Building Permit Approval

 Consolidated Efficiency

Last Updated on Friday, 16 November 2012 09:34